Free Estimates Residential & Commercial
Sooner Premiere Construction

Home / Projects

Projects

The kinds of jobs we take on and what is actually involved in each one, so you know what you are signing up for before the first day.

Project Types

What We Build

Recent Work

Job Photos

Real jobs, shot on site by the crew. Tap any photo to see it full size.

New Home Construction

Drywall hung, taped and floated on a new build. Vaulted ceilings, open stair and big windows, ready for texture and paint.

Vaulted living room with open staircase, drywall taped and floated Staircase drywall finished on a new home build Bedroom drywall taped and floated, ready for texture Drywall finished around new windows on a new build Finished drywall in a bedroom with a view of the lot Living area drywall with new windows set Great room drywall floated, patio doors in Bedroom drywall finished with a new window and door Two story entry with scaffold, drywall taped and floated Crew finishing drywall in an open living room

Whole Home Remodel

Existing house taken back to bare floors, walls repaired and repainted, then new plank flooring and tile going down room by room.

Closet shelving repainted, floors prepped for new flooring Living room repainted and prepped for new floors Kitchen and dining with new tile floor Bathroom repainted, vanity and tile floor in place Bedroom walls prepped for repaint Hallway with new plank flooring meeting new tile Bedroom repainted, floor prepped for new flooring Bathroom trim taped off and repainted Living room with new wood look plank flooring and fresh paint Closet repainted with shelving reinstalled

Ceiling Texture & Paint

Occupied home, furniture and walls masked off, ceilings retextured and painted with a clean finish and no mess left behind.

Room masked in plastic for ceiling work Ceiling texture going on over a masked room Fresh ceiling texture close up Hallway ceiling retextured with walls masked Work light and ladder set for ceiling finishing Ceiling retextured over a masked living room Ceiling finish work with the room fully protected Furniture and decor covered while ceilings are finished Finished ceiling with crisp edge at the wall Ceiling painted, plastic still up on the walls Corner detail on a retextured ceiling Ceiling fan area finished, room masked Finished ceiling, clean transition to the wall Living room ceiling finished and painted

Order Of Operations

How A Full Remodel Runs

The sequence matters more than most people expect. Doing it out of order is what turns a six week job into a four month one.

01

Demo & Frame

Tear out what is going, then frame the new layout so every trade behind us has something square to work from.

02

Licensed Trades

Electrical, heat and air, and plumbing get open walls and clean access. We stay out of their way and keep other areas moving.

03

Drywall & Texture

Once inspections clear, we close the walls up, tape, float and texture to match the rest of the house.

04

Paint & Finish

Prime and paint, set flooring, run trim and baseboard, then walk the punch list with you before we call it done.

See Each Trade In Detail

Job Photos

Want To See Work Like Yours?

Photos from recent jobs get posted here as projects wrap up. If you want to see something specific in the meantime, call and ask. We will send over pictures of the closest thing we have done.

Call (405) 812-2607

Free Estimates

Ready To Start Yours?

Tell us what you have in mind and we will walk the space and put a real number on it.

Call Text